- The roundtable agreed that the first thing that the owner should develop is a business plan to define the vision and the budget
- The use permit can proceed concurrently with the business plan
- Get people involved with the expertise up front
- Have a dedicated winemaker in place
- Architectural schematic design includes: the design process, design development, construction documents and construction
- Appriopriate design of the refrigeration load for the three months that it will be needed
- Importance of freight access; loading dock
- Power needs and energy costs
- Building with ADA (Americans with Disabilities Act) in mind
- How to deal with waste water
References:
1. Bill Pregler, Industry Roundtable: Winery Construction Part 1 -- Plan for Success, Wine Business Monthly, June 2010.
2. Bill Pregler, Industry Roundtable: Winery Construction Part 2 -- Plan for Success, Wine Business Monthly, June 2010.
No comments:
Post a Comment